Case Study - London Borough of Tower Hamlets

The
Project


Contract: Boiler plant and control system replacement works at Bethnal Green Library

Value: £160,000

Period: 14 weeks

 


Download the
Case Study

 

Oakray were tasked with the design and installation of new heating plant that was simple to control, reliable and brought value for money in terms of capital expenditure. The heating system replacement was an integral element of a general refurbishment of the Grade 2 listed building.

...

The heating system was of single pipe layout utilising cast iron radiators and natural convectors fitted within the original book cases, suiting the architecture of the building. Due to the configuration and the lack of zone control it was decided to install wireless thermostatic radiator valves, enabling building staff to remotely control and programme the various areas within the building. Due to the age of the existing pipework and heat emitters it was decided to keep the existing system as open vented however the provision of a plate heat exchanger ensured that the new boilers and plant would be afforded protection by creating a sealed primary system.


...

 

Delivering the Solution


New ultra-low emission

Vaillant boilers

Bespoke boiler room ventilation system

Modern, efficient control system offering remote monitoring

Increased comfort levels.

Results


Project completed within programme and budget

Reduced carbon footprint

Improved heating delivery

Energy savings through effective controls and efficient plant

Projected energy savings 30-40%

 